Posted in Building and Code on April 19, 2010 by Building Code
2008-12-29 10:38:41 NYS Energy StarĀ®-Labeled Homes (69k)
Local Law No. 5 of the year 2008
Posted in Building and Code on April 19, 2010 by Building Code
Impacts, Mitigation, DEQR Thresholds
The following cites potential impacts, mitigation, SEQR thresholds and development guidelines for new projects within the Putt Comers Road corridor:
Geology:
Impacts:
-
Poorly drained soils and areas of shallow bedrock would hamper the function of septic systems, resulting in storm water and ground water contamination
-
Historical use of pesticides may have resulted in soil contamination in portions of the study corridor.
Mitigation:
-
State and potential federally regulated wetlands, as determined by the NYS Department of Environmental Conservation mapping, Soil Conservation Service soils mapping, aerial photography, and a site walkover, were removed from the calculations of developable area within the corridor.
-
Sewage disposal capacity will be provided to the corridor but limited to the current available capacity .
-
Septic systems are not desired as a marketable means of attracting new development
SEQR Thresholds:
-
Normal foundation excavation. Blasting is inappropriate on North Putt Comers Road.
-
Site development plans must include a soil erosion and sediment control plan.
-
Pesticide residue toxicity within federal and state standards.
Water:
Impacts:
Mitigation:
SEQR Thresholds:
-
Wastewater disposal less than 1,000 g.p.d. for septic systems. Soils appropriate for septic systems or incorporation of modified raised bed system.
-
Wells located up-slope of septic system.
-
No impact on the quality or quantity of water in existing wells.
-
No disturbance of state regulated streams.
-
Storm water management plan based on NYSDEC guidelines and Town and Village requirements.
Air Quality:
Impacts:
-
Dust generated during construction could adversely impact adjacent uses, particularly on North Putt Comers Road and near the high school.
-
Industrial development could result in pollutant emissions to the atmosphere as part of a manufacturing process.
Mitigation:
SEQR Thresholds:
Ecology:
Impacts:
-
Significant natural habitat could be lost to impervious area and landscaping.
-
Significant loss of state and federal wetlands could occur as a result of over development. As the better, drier lands are developed, wetland areas could become more attractive for development.
Mitigation:
-
Preserve natural open space wherever possible, encourage clustered development and maintain current open space requirements of the Town and Village zoning ordinances.
-
Preserve federal and state regulated wetlands. These areas were removed from the total area of the corridor and considered undevelopable by this plan.
SEQR Thresholds:
-
Each development provides at least 50% open space if in Village and 65% open space if in Town.
-
No impact to state regulated wetlands, except for storm water discharge.
-
Wetland delineation report accepted by U.S. Army Corps of Engineers.
-
Impact to federal isolated wetlands or wetlands above headwaters less than one acre cumulative for project. No impact to wetlands below headwaters, except for storm water discharge.
-
No impact to any federal or state listed threatened or endangered species. (DGEIS, Appendix C, NYSDEC correspondence of 09/29/93 indicated there are no threatened, endangered or special concern species of wildlife present in the Putt Comers Road study area).
Traffic:
Impacts:
Mitigation:
SEQR Thresholds:
Traffic Improvements:
Level 1 Improvements (1.29 million gsf office or 1.77 million gsf light industrial)
Level 2 Improvements (2.0 million gsf office or 1.78 million gsf light industrial) to be implemented when a project exceeds the Level 1 impacts.
-
Widen Main Street to four lanes from approximately 400 feet west of the Cherry Hill Road intersection to the Thruway crossing. Based on NYSDOT information, the crossing is scheduled to be widened to four lanes in 1996. The widening will extend to the Main Street/North-bound Thruway ramp and Putt Comers intersections.
General
Land Use and Zoning
Impacts:
Mitigation:
SEQR Thresholds:
-
When located adjacent to existing residential development, residentially zoned land, or schools, office or light industrial uses will have no less than 100 feet of dense, natural and, if necessary , planted buffer so as to prevent significant visual and noise impacts.
Community Services
Impacts:
-
An agreement between the Village and the Town obligates the Village to provide a sewer capacity of 50,000 g.p.d. to the Putt Comers Road corridor. However, use of the capacity will be on a first come, first serve basis if in-district development occurs prior to development in the corridor. Residential development in the Village portion of the corridor could result in the need to expand the sewage treatment plant.
Mitigation:
-
Based on land, sewer and traffic thresholds. the magnitude of development will be limited to 1,045,00+ gsf office in the Town and 245,000 gsf office in the Village, or their equivalent in a mix of office and light industrial uses under the same thresholds.
SEQR Thresholds:
Cultural Resources:
Impacts:
Mitigation:
SEQR Thresholds:
-
When located adjacent to existing residential development, residentially zoned land, or schools, office or light industrial uses will have no less than 100 feet of dense, natural and, if necessary 1 planted buffer so as to prevent significant visual and noise impacts.
Fiscal Impact:
Impact:
Mitigation:
SEQR Thresholds:
Posted in Building and Code on April 19, 2010 by Building Code
Putt Corners Corridor Development Plan
Prepared for the New Paltz Town and Village Consolidated Planning Board By: Town: Village: of New Paltz Vici Danskin, Donald Martin, Ik Icard, Carole Smith
Introduction
Putt Corners Road Corridor Development Plan
DESCRIPTION OF ACTION: Preparation of land use plan for Putt Corners Road area which will analyze the desirability of such corridor for commercial and industrial development and will disclose potential adverse environmental effects and prescribe mitigation for such development and will further establish performance criteria for future development in the corridor so as to facilitate appropriate development within the corridor.
LOCATION: Town and Village of New Paltz beginning at the intersection of New York State Route 32 and South Putt Comers Road, extending along and adjacent to South Putt Comers Road across New York State Route 299 along and adjacent to North Putt Comers Road to the northeast boundary of the Village Professional Business ("pa") Zoning District, consisting of a total of approximately 391 acres.
POTENTIAL ENVIRONMENTAL IMPACTS: The Putt Comers Planning Corridor Land Use Plan analyzed the desirability of this area for commercial and industrial development, and disclosed the potential adverse environmental effects, prescribed mitigation for such development, and further established performance criteria for future development in the corridor so as to facilitate appropriate development. This land use plan encourages growth and development in the Putt Comers Corridor and such growth inducement may potentially impact the Town and Village in the following areas:
-
Geology
-
Surface and ground water quality and/or quantity
-
Air resources
-
Terrestrial and aquatic ecology
-
Transportation and traffic patterns within area
-
Community services and infrastructure
-
Demography of area
-
Cultural resources
Copies of the DGEIS, FEGIS, and SEQR Findings Statements, (February, 1995) are available at the following locations:
- Town of New Paltz
- Post Office Box 550
- 1 Veteran Drive
- New Paltz, NY 12561-0550
- (845) 256-0100, Clerk
- (845) 255-0102, Building Inspector
- Village of New Paltz
- Post Office Box 877
- 25 Plattekill Avenue
- New Paltz, NY 12561-0877
- (845) 256-255-0130, Clerk
- (845) 255-3055, Building Inspector
The Draft Environmental Impact Statement (DGEIS) reveals that development of South Putt Comers Road could occur without significant impact to community character. In general, the same conclusion is reached regarding impacts to the natural environment, however, it is assumed that this will be addressed more closely during site plan review for individual projects. Development of North Putt Comers Road should take into consideration the existing residential land use. Therefore, compatible use is another important factor.
For the Final Generic Environmental Impact Statement (FGEIS), a project goal was established to maximize positive impact and minimize environmental and community character impact. To advance this goal, the following additional parameters were established:
Traffic volume should be limited to approximately 1628 peak trips within the corridor to avoid widening of Putt Comers Road to four lanes at a cost of $5 million.
Development of individual sites with septic systems is not expected to attract new development to the community. Sewer systems will be required to enhance the potential for successfully attracting development for the corridor. Available sewer capacity is currently limited to 50,000 g.p.d. on a first come, first serve basis. Expansion of sewage treatment plant would cost approximately $5.5 million.
Development guidelines and thresholds will control the physical character of new development.
The community water supply from the adequate, based on per person water I Paltz.
New York City System appears to be use data provided by the Town of New.
Final impact analysis reveals that office uses would result in a higher net fiscal benefit than the other development options. It also has less demand on the sewer system than light industrial and residential uses. Therefore, office development and certain light industrial development with comparable Real Property Tax benefits should be distributed in the corridor. Based on an allocation of 50,000 g.p.d. excess sewer capacity to the corridor, approximately 1,045,000 gsf office could be developed in the Town and approximately 245,000 gsf office in the Village. If residential development is considered more appropriate for the Village, then single-family residential on septic systems should be considered with approximately 1.29 million gsf office in the Town.
If the sewage treatment plant is expanded, then total development could increase to approximately 1,124,000 gsf office in the Town and approximately 530 high density multi-family residential units could be developed in the Village. This would result in a maximum fiscal benefit without exceeding roadway improvement parameters. When considering the overall function of the Village portion of the corridor and the remaining Erman lands, it may be appropriate to designate this area a PUD to allow a mix of residential and neighborhood/hamlet commercial development to support the needs of the area.
Posted in Building and Code on April 19, 2010 by Building Code
Posted in Building and Code on April 19, 2010 by Building Code
2008-09-15 13:22:09 Accessory Buildings (229k) A building permit is needed for the construction of sheds (including prebuilt "drop sheds"), detatched garages, carports etc.
2008-09-19 08:41:51 Demolition (265k) Needed for the demolition and removal of a structure.
2008-09-15 13:22:09 Electrical Upgrade (194k) An electrical upgrade permit is needed for any electrical work to be done - work must be inspected by an authorized third party electrical inspector. A list of the approved inspectors can be found under the "Supporting Documents" tab.
2008-09-15 13:22:09 Fence (247k) A building permit is needed for the construction of a fence. per Town of New Paltz Code - Chapter 140-32
2008-09-25 08:01:21 Fuel Burning Appliances (222k) Needed for the installation of any fuel-burning appliance (ie. Wood or Pellet burning stoves, fireplaces or fireplace inserts, furnace or boiler etc.)
2008-09-15 13:22:09 Swimming Pools (257k) A building permit is needed for all swimming pools including above ground, inground, spas, hot tubs etc. per Town of New Paltz Code Chapter 140-30 C.
Posted in Building and Code on April 19, 2010 by Building Code
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
Municipal Code Officer
Local Law No. 5 for the year 2008 **** NY State Energy Star®-Labeled Homes ****
Energy Star Website
Wetlands Inspector – James “Spider” Barbour (phone 255-0102 x1 to schedule Wetlands inspections)
The forms and applications found here require Adobe Acrobat Reader
Posted in Building and Code on April 18, 2010 by Building Code
Summary of Major Issues
-
Availability of water
-
Costs associated with sewer -and water supply
-
Provision of by-pass roads to avoid Main Street congestion
-
Potential widening of Putt Comers Road
-
Wetland avoidance
-
Cost of pesticide remediation
-
Zoning amendments
-
Vision for the corridor
New development will be managed to meet the intent of the State Environmental Quality Review (SEQR) and to ensure that development is functional, efficient, and attractive. To that end, SEQR parameters and site plan guidelines are important. The DGEIS covers many aspects of the Corridor's natural and human environment. As a result, SEQR allows the establishment of thresholds for the purpose of minimizing future SEQR review on site specific projects. If Type I and Unlisted actions fall within the thresholds established in this FGEIS the Lead Agency may issue a Negative Declaration on that basis. Prjects which exceed one or more of the thresholds may require further review.
Development guidelines establish a checklist of issues that must be addressed to be in accordance with the Putt Comers Road Corridor Development Plan. The development guidelines are a direct result of the SEQR process and can be used in combination with the SEQR review parameters to ensure the Town and Village that important site development issues that are outside of the SEQR process are being thoroughly reviewed.
The purpose of the plan is to encourage and guide growth in the Putt Comers Road corridor. In general, the plan will have a beneficial impact on the community over time through its recommendations for development type and density, preserving open space, and its provision for maximizing fiscal benefit.
The recommendations of the development plan, as provided in the DGEIS and FGEIS, \are based on the potential impacts that could result from development that is inconsistent with the plan for the corridor and the mitigation measures that can be employed to control or eliminate these impacts. Evaluation of potential impacts and mitigation led to the development of SEQR thresholds that will streamline the SEQR process by limiting future site-specific environmental review to those projects that exceed the established thresholds. Applicants will be required to provide the following information in order to provide the respective planning boards with a complete application package for site plan review.
Complete Application Minimum Requirements
No further SEQR documentation from the applicant will be necessary providing the parameters of the proposed project are below the established SEQR thresholds.
-
Long Form EAF, Parts 1 & 2. The Planning Board may request Part 3 if one or more SEQR thresholds are surpassed.
-
Location map at a minimum scale of 1" = 2000'
-
Site Plan drawings that include the following information:
-
Drawn to scale between 1"=20' to 1"=50'
-
Property boundary lines and dimensions clearly labeled.
-
Topographic features with 2 foot contours.
-
Date, scale, North arrow.
-
Name of owner.
-
Name and seal of engineer or surveyor.
-
Names of adjoining property owners.
-
Zoning district.
-
Existing ponds and streams with NYSDEC water quality classification.
-
Wetlands as defined or mapped according to NYSDEC or Corps of Engineers.
-
100 year flood plain.
-
Forested areas with general description of species.
-
Tree survey (7" or greater in diameter at 12" above ground.)
-
Rock outcrops.
-
Existing easements.
-
Proposed easements
-
Rights of way
-
Existing streets, roads, highways, rail or other rights of way.
-
Location, dimensions, and distances to property lines of existing structures
-
Existing deed restrictions.
-
Proposed restrictions and covenants
-
Location and use of each proposed building and/or structure(s)
-
Dimensions of each proposed building and/or structure(s).
-
Number of proposed bedrooms per unit if residential.
-
Distance to property lines of proposed building and/or structure (setbacks indicated)
-
Location, use, and ground area of any other land use.
-
Location of proposed streets and curbing.
-
Width of proposed streets.
-
Street elevations.
-
Location of off- street parking including handicapped parking spaces.
-
Dimensions of off- street parking
-
Capacity of off- street parking.
-
Location and dimensions of proposed loading berths.
-
Location of - proposed handicapped access ramp(s)
-
Location of proposed entrances and exits to public rig:-it:; of way.
-
Location of proposed driveways.
-
Traffic signals or signs.
-
Channelization
-
Acceleration and deceleration lanes.
-
Additional width of - streets.
-
Other devices necessary for traffic safety.
-
Location and dimensions of proposed open spaces, parks or recreation areas.
-
Location of proposed landscaping.
-
Species and size of proposed landscaping.
-
Location and design of buffer areas and/or screening devices.
-
Location of sidewalks, walkways, and any other areas of pedestrian use.
-
Location of handicapped access ramps.
-
Sidewalk specifications.
-
Location of existing and proposed water lines.
-
Location of existing and proposed sewer lines.
-
Location of existing and proposed poles and power lines.
-
Location of existing and proposed catch basins, storm sewers, and culverts.
-
Location of existing and proposed fire hydrants.
-
Location, type, and size of proposed lighting
-
Location and type of underground and/or above ground storage tanks.
-
Location of dumpster(s).
-
Drainage calculations for 25/50/100 year stOm1 water runoff .
-
Erosion and sedimentation control plan.
-
Measures for water quality control.
-
Lot coverage calculations. (buildings, structures. sidewalks, paved areas)
-
Location, size, and type of illumination of signs.
-
Elevations of proposed building(s)
.
Consistent with social, economic and other essential considerations, to the maximum extent practicable, adverse environmental effects will be minimized or avoided by incorporating as conditions to the decision those mitigative measures which were identified as practicable in the Draft and Final GEIS and in the Findings Statement.
Posted in Building and Code on April 18, 2010 by Building Code
DEVELOPMENT GUIDELINES
Development guidelines will be required to insure that development has a minimum impact on the natural environment and community. The following development guidelines are based on the assumptions that office development maximizes net fiscal benefit, traffic mitigation will be limited to intersection improvements, and 50,000+ g.p.d. sewer capacity will be available:
Development Density and Type:
Office development maximizes net fiscal benefit ($0.45/gsf in Town and $0.76/gsf in Village) and minimizes sewer system impact. High Density residential also has a high net fiscal benefit ($0.63/gsf) and, at build-out, would result in a higher total fiscal benefit than office development due to a more intensive use of the land (greater gsf). However, this alterative would require sewage treatment plant expansion. Corridor would support 1.22 million gsf office in Town and 128 single-family residential on septic in the Village without exceeding the traffic threshold. The net fiscal impact to the Village for 128 single-family homes is $178,000. Development of the Village with 245,000 gsf office space could yield $186,000, a difference of $8,000.
Structures:
Septic: Office and light industrial facilities not to exceed 10,000 gsf per building
Pressure Sewer: As dictated by site constraints and flow rates
Gravity Sewer: As dictated by site constraints.
Buildings shall not exceed 40 feet above grade in 1-1 Zone and 30 feet above grade in P-B Zone.
Office -As dictated by FGEIS Table B-5. In addition: Minimum 100 feet from existing residences and residentially zoned land.
Light Industrial- As dictated by Table B-5. In addition: Minimum 100 feet from existing residences, residentially zoned land arid public facilities. .
Residential -As dictated by Table B-5.
Table B-5
Setback Specifications
|
Lot Type
|
Width
|
Front
Side
Rear
Minimum Yard Setbacks
|
Max. Lot Coverage (%)
|
Max. Height
|
|
Single Family
|
100*
|
50 20 25
|
30
|
30
|
|
Medium Density
Multi-family
|
50*
|
25 12.5 25
|
30
|
30
|
|
High Density
Multi-family
|
50*
|
25 12.5 25
|
60
|
30
|
|
P-B
|
200*
|
50** 25** 20**
|
50
|
30
|
|
I-1
|
100*
|
50** 25** 50**
|
35
|
40
|
* Lot frontages (width) do not apply to cul-de-sac lots
** A 100 foot setback will apply to any light industrial or office use that is adjacent to existing residences or residentially zoned land with the Village or Town.
Minimum Open Space:
Village = 50% open space per lot
Town = 65% open space per lot
Allow clustering of multi-building developments to preserve large pieces of contiguous open space.
Drainage and Erosion Control:
-
Require construction to be sequenced, where appropriate, so that all exposed soils shall be graded, top-soiled and seeded as soon as construction operations permit. This includes areas that are to be re-graded and will not be subjected construction traffic. The purpose is to establish new lawn area as quickly as possible to reduce the amount of time disturbed soil is exposed to erosive forces.
-
Protecting the bottom of the foundation, or slab, from upward movement of water by utilizing a layer of heavy grade gravel in combination with " rubber membrane placed beneath the slab. To alleviate water pressure buildup and consequent heaving of slabs perforated PVC pipe placed six to eight feet apart will act as underfloor drains.
-
Placing a water permeable cushion in the form typically of gravel to mitigate the problems of frost action and consequent damage of walks, roads and underground pipes. A filter fabric designed and placed to restrict water movement can also be used in conjunction with the gravel. Well-constructed expansion and control joints will absorb movement of infrastructure that actually occurs.
Landscaping:
Circulation and Parking:
Portions of the corridor on South Putt Comers Road and in the Village would be best served by internal road systems to avoid individual curb cuts. Cul-de-sacs would also work in areas where an internal road is not practical. The Town and Village should develop a preferred collector road concept plan for the corridor.
Foundation:
-
If blasting must occur, require that procedures set forth in the Town and/or Village of New Paltz municipal codes and other procedures required by Town and/or Village officials be carried out to prevent hazardous situations or undue discomfort (e.g., noise, vibrations, smoke, dust} to residents of the municipalities.
Toxic Pesticide Residue:
Air Quality:
Habitat Preservation:
Wetland Preservation:
-
Where soils data, aerial photographs and state wetland maps indicate the potential for wetlands, require the project sponsor to conduct a wetland delineation based on federal regulations and procedures (currently 1987 Corps Manual). A separate delineation may be required for state wetlands. This should be coordinated between the project sponsor and NYSDEC. However, state wetlands also require a federal delineation in order to determine federal jurisdiction.
-
If above headwater or isolated wetland area is to be impacted and the impact is' less than one acre, the Corps will not require notification. The Town or Village should not require a letter from the Corps as this will unnecessarily slow the site plan review process and place unnecessary workload on the Corps. However, the Town and Village should require that the wetland delineation be approved by the Corps. This is typically referred to as a jurisdictional determination. (This recommendation is based on 1993 Corps policy regarding NWP #26. This recommendation shoul9 be modified as the Corps policies change.)
Traffic Improvements:
Land Use:
-
At 1east a 100-foot buffer should be required between light industrial, warehousing, or office uses and residential uses. This buffer should remain in its natural state, if currently forested, or planted with trees and shrubs, that are indigenous to the area to provide adequate visual buffer.
-
Existing Town and Village Zoning that prohibits any type of use that emits noxious or toxic fumes, smoke or dust, radiation, gas, noise, vibration or excessive light, or any combination of these elements which is dangerous and prejudicial to the public health, safety and general welfare- of the community (Town Zoning Section 140-9, p.14025) should be enforced in the corridor, especially when industrial uses abut residential areas.
Community Services:
Education:
-
Office or light industrial uses adjacent to the school should incorporate sufficient buffers (minimum 100 feet) and plantings, as necessary, to eliminate potential impacts to the school, such as noise, traffic, and hazardous conditions.
Recreation:
Water Supply:
Developments with wells:
Developments with public water:
Wastewater Disposal
Developments with septic systems:
-
Locate septic systems to prevent contamination of wells. At the developer's expense, require periodic testing of wells, particularly existing wells on North Putt Comers Road to be performed by an independent firm that reports directly to the Town or Village.
Developments with Sewers:
-
Require developers to prepare an analysis of sewer needs and potential improvements (e.g., construction or upgrade of pump station, provision of grinder pumps, etc.}. Assuming 50,000 g.p.d. is available, development should not exceed 0.039 g.p.d./gsf.
Aesthetics:
-
At least a 100 foot buffer should be required between light industrial, R&D, warehousing. or office uses and residential uses. This buffer should remain in its natural state, if currently forested, or planted with trees and shrubs, that are indigenous to the area, to provide adequate visual buffer.
Noise:
-
Existing Town and Village Zoning that prohibits any type of use that emits noxious or toxic fumes, smoke or dust, radiation, gas, noise, vibration or excessive light, or any combination of these elements M...which is dangerous and prejudicial to the public health, safety and general welfare" of the community (Town Zoning Section 140-9, p.14025) should be enforced in the corridor, especially when industrial uses abut residential areas.
-
Require a noise impact study when the proposed development will result in activities, other than normal traffic but including heavy truck traffic, that may produce noise levels that may exceed 75 decibels at the adjoining property line (e.g., sirens, whistles, equipment operation, delivery trucks, and as enumerated in the Village Municipal Code -Chapter 68, Section 68.4) and the development occurs adjacent to residential development and/or a buffer zone.
|
Soil Type
|
Shallow Excavations
|
Dwellings without Basements
|
Dwellings with Basements
|
Small Commercial Buildings
|
Local Roads and Streets
|
Lawns and Landscaping
|
|
BgC
|
Moderate: slope, wetness, small stones
|
Moderate: slope, frost action
|
Moderate: slope, wetness
|
Severe: slope
|
Moderate: slope, frost action
|
Moderate: slope, small stones
|
|
BnC Bath
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
|
Nassau
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
|
BOD Bath
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
Severe: slope
|
|
Nassau and rock outcrop
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
Severe: slope, depth to bedrock
|
|
BRC Bath
|
Moderate: slope, large stones, wetness
|
Moderate: slope, large stones, frost action
|
Moderate: slope, large stones, wetness
|
Severe: slope
|
Moderate: slope, frost action
|
Moderate: slope, large stones
|
|
Mardin
|
Moderate: slopes, wetness
|
Severe: frost action
|
Moderate: wetness, frost action
|
Severe: slope, frost action
|
Moderate: frost action, slope
|
Moderate: large stones
|
|
Cd Canandaigua
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness, frost action
|
Severe: wetness
|
|
CnB Chenango
|
Severe: small stones
|
Moderate: frost action
|
Slight
|
Moderate: slope, frost action
|
Moderate: frost action
|
Moderate: small stones
|
|
CnC Chenango
|
Severe: small stones
|
Moderate: slope, frost action
|
Moderate: slope
|
Severe: slope
|
Moderate: slope, frost action
|
Moderate: slope, small stones
|
|
HgC Hoosic
|
Severe: small stones
|
Moderate: slope
|
Moderate: slope
|
Severe: slope
|
Moderate: slope
|
Severe: small stones
|
|
LY Lyons
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness, frost action
|
Severe: wetness
|
|
Atherton
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness, frost action
|
Severe: wetness, large stones
|
|
MdB Mardin
|
Severe: wetness
|
Moderate: frost action, wetness
|
Severe: wetness
|
Moderate: frost action, slope
|
Moderate: frost action
|
Moderate: small stones
|
|
MgB Mardin
|
Same
|
Same
|
Same
|
Same
|
Same
|
Same
|
|
Nassau
|
Severe: depth to bedrock
|
Severe: depth to bedrock
|
Severe: depth to bedrock
|
Severe: depth to bedrock
|
Severe: depth to bedrock
|
Severe: depth to bedrock
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
VoA, VoB Volusia
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: frost action
|
Moderate: small stones, wetness
|
|
VSB Volusia
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: wetness
|
Severe: wetness, frost action
|
Severe: frost action
|
Moderate: small stones, wetness
|
| The suitability of the soils to support building ranges from severe to moderate. Severe wetness is closely associated with hydric soils and soils with hydric inclusions. Because these soils are mostly found in wetlands and because wetlands have been eliminated from the buildable area, significant construction on these soils is unlikely. Wetness and subsequent frost damage are prevalent for most of the soils due to a slowly permeable fragipan located within the first two feet of the ground surface. In some instances, this results in a perched water table that is at or near the surface. Fortunately, this condition can be mitigated through several drainage and "waterproofing" techniques discussed in DGEIS Section 3.1.3. Another potential problem is shallow depth to bedrock. This is primarily associated with the Nassau complexes and often occurring on steep slopes. Soils information suggests that most of the soil types within the project study area are deep. |
Posted in Building and Code on April 17, 2010 by Building Code
2008-09-15 14:49:14 Workers Comp Form bp-1 (60k) Submitted with a permit application when the owner and occupant of a Single Family Residence is performing the work. If the individual doing the work is not a corporation and has no employees go to the NEW YORK WORKERS' COMPENSATION BOARD WEBSITE and attain the form CE-200 which is an ATTESTATION OF EXEMPTION FROM NEW YORK STATE WORKERS' COMPENSATION. Link to the form: http://www.wcb.state.ny.us/content/ebiz/wc_db_exemptions/wc_db_exemptions.jsp
|